Case Study - Raby Castle

RAF Leeming

2023

Northallerton

A ground mount solar system to supply renewable energy to their new air crew training facility

Overview

RAF Leaming required  a ground mount solar system to supply renewable energy to their new air crew training facility. The system consisted of a screw driven ground mounting frame. This was ideal for the ground conditions that encountered on site.

We mounted 15kw of solar panels which helped with the electricity use of the new facility. The ground mount was orientated to face due south so  the building would gain the maximum benefit from the solar panels.